Vietjet tops out hangars, launches first flight to Long Thanh airport
Tuesday, December 30,2025
AsemconnectVietnam - Vietjet on December 19 operated its inaugural flight to Long Thanh International Airport. Flight VJ038, operated by an Airbus A321neo, departed from Tan Son Nhat Airport and landed safely, comfortably and on schedule at Long Thanh.
The new-generation carrier Vietjet Air on December 19 marked two major milestones at the newly-inaugurated Long Thanh International Airport in the southern province of Dong Nai with the topping-out ceremony of its international-standard aircraft maintenance hangar project and the launch of its inaugural flight to the new airport.
The hangar project, which broke ground on August 19, 2025, forms part of the Aircraft Maintenance and Engineering Centre at Long Thanh, with a total investment of up to 100 million USD and a land area of 8.4 hectares. The construction of Hangars No. 3 and No. 4 has been designed, managed and supervised by international firms Mace (the UK) and Apave (France).
Completed on schedule in just four months, the project features a large-span steel space-frame structure that meets global aviation technical standards. Once operational, the hangar complex will be capable of accommodating and maintaining up to six narrow-body and two wide-body aircraft simultaneously, or up to ten narrow-body aircraft.
The project is expected to play an important role in enhancing domestic technical capacity, reducing overseas maintenance costs, improving fleet operational efficiency, and generating additional jobs and economic value for Vietnam’s southern region.
Alongside infrastructure development, Vietjet operated its inaugural flight to Long Thanh International Airport. Flight VJ038, operated by an Airbus A321neo, departed from Tan Son Nhat Airport and landed safely, comfortably and on schedule at Long Thanh.
Source: Vietnamplus.vn
MHC contributes VND61.38 Billion to subsidiary in real estate sector
ADB, BIDV support Vietnam’s green agriculture with 250 million USD financing package
EVN launches major power projects
Vinh Long, Singaporean company eye cooperation in renewable energy, eco-industrial parks
Firms advised to adapt to new EU standards to sustain exports
Vimico (KSV) expects gold production in 2025 to reach 918 kg, with total revenue of VND14,454 billion
BSR exceeds 2025 profit plan
Duc Giang Chemicals (DGC) to pay dividend 30% in cash
Apatit Vietnam (PAT) plans to pay 100% interim dividend
Petrovietnam officially divests all 24.9 million Petrosetco (PET) shares
VPS's business prospects after IPO
HVA Investment intends to terminate cooperation and divest from 3 investment projects
Masan Consumer (MCH) to be listed on HOSE on December 25th
Hua Na Hydropower (HNA) estimated to achieve 153% of the 2025 electricity production plan

Plan of Hai Duong province for a period of 2021 - 2030, ...
Organize space reasonably and harmoniously, focusing on connecting Hai Duong in common development space, actively contributing to the ...Plan of Hau Giang province in a period of 2021 - 2030, ...
Sustainable forestry development program in a period of ...

Vietnam’s auto sales up 6.5% over 11 months
The Vietnam Automobile Manufacturers’ Association (VAMA) has reported that total auto sales of its members in the first 11 months of 2025 ...Vietnamese canoeists bring home first gold at SEA Games 33
SEA Games 33: Good news keeps flowing from swimming, ...
Exhibition on President Ho Chi Minh’s footprints in Russia ...


