Solid waste treatment plan of Ho Chi Minh city to 2025, vision to 2050
Sunday, December 30,2018AsemconnectVietnam - To be in line with socio-economic development plan; land using plan; adjusted construction master plan of Ho Chi Minh City to 2025 and other relevant sector plans (industrial development plans, trade development plans, etc.).
Scope of direct research: according to administrative boundary of Ho Chi Minh City with an area of 2,095.6 km2 (including 19 urban districts and 5 suburban districts). Location of research area is limited as follow:
- To border Binh Duong province to the North;
- To border Dong Nai province to the East and Northeast;
- To border Ba Ria Vung Tau province to the Southeast;
- To border Tay Ninh province to the Northwest;
- To border Long An province and Tien Giang province to the West and Southwest.
Scope of indirect research: Ho Chi Minh City and provinces in Ho Chi Minh City region, including provinces of Binh Duong, Binh Phuoc, Tay Ninh, Long An, Dong Nai, Ba Ria - Vung Tau, Tien Giang with an area of 30,404 km2 and total amount of population of about 18 million persons.
Types of solid wastes to be studied in solid waste treatment plan of Ho Chi Minh city to 2025 with a vision toward 2050 including ordinary and hazardous solid waste arising from following sources:
- Daily-life solid wastes (including daily-life solid waste of residential and public areas);
- Industrial solid wastes (hazardous and ordinary);
- Medical waste (hazardous and ordinary);
- Construction solid waste;
- Sludge from drainage and wastewater treatment system (including waste, sludge on canals), sewage sludge from water plant and septic tank mud (referred to as sludge).
(Radioactive waste is particularly hazardous type and should be studied separately and not subject of the plan).
To be in line with socio-economic development plan; land using plan; adjusted construction master plan of Ho Chi Minh City to 2025 and other relevant sector plans (industrial development plans, trade development plans, etc.).
To be in line national strategy on integrated management of solid waste until 2025 with a vision to 2050; solid waste management plan for Dong Nai river basin up to 2030 which has been approved by the Prime Minister.
To encourage participation of various economic sectors in order to bring into play competitiveness and at the same time ensure strict management of the State in order to meet improvement of integrated management of solid waste and improve quality of environment in accordance with custom of the people, ensure public health and sustainable development.
To ensure goals of waste security, security and defense of the city, responding to impacts of climate change.
To propose measures to reduce solid waste arising at source, increasing reuse and recycling; proposing to build a network of transshipment stations to ensure inter-district service with modern and advanced technologies to meet demand of collecting, transporting and treating solid waste of the city in each period; To propose advanced technologies for treatment of solid wastes, to limit landfill for land resources, construction costs, minimize environmental pollution;
To meet demand of solid waste treatment in the whole city. Resolving existing issues, limitations in management of municipal solid waste at present. To improve efficiency of integrated management of solid waste, improve quality of environment, ensure public health and sustainable urban development.
To raise community awareness on solid waste management, forming an environmentally friendly living way. To set up necessary conditions on infrastructure, finance and human resources for the State management of solid waste. Raise sense of volunteering to abide by the regulations on solid waste management of the people.
To be legal basis for implementation of detailed plan, project setting up, investment preparation and construction management in accordance with the plan.
5. Contents of plan study:
Contents of solid waste treatment plan of Ho Chi Minh City up to 2025 and vision toward 2050 shall comply with provisions in Article 28 of Decree No. 37/2010/NĐ-CP dated April 7, 2010 of the Government on planning, appraisal, approving and management of plan and Circular 12/2016/TT-BXD June 29, 2016 on regulating dossier of regional construction planning tasks and blueprints, urban plan and construction plan of specific functional areas, content of strategic environmental assessment in compliance with regulations on Circular No. 01/2011/TT-BXD.
- To propose methods of storing and classifying solid wastes at source; projects on recycling and reusing solid waste arising from daily life, industrial production, healthcare, construction and services;
- Solid waste treatment plan of Ho Chi Minh City up to 2025 with a vision to 2050:
+ To determine zoning, transportation and treatment of solid waste in Ho Chi Minh city and inter-regions (if any); To determine solid waste collection, transportation and treatment methods;
+ To determine locations and sizes of transfer stations, solid waste treatment and burial facilities; determining environmental sanitation safe distance, technical infrastructure outside fences of transfer stations and solid waste treatment facilities in each planning period; Total land fund for transshipment and solid waste treatment in each plan period.
- Building plans, solutions and resources for implementation of the master plan:
+ To identify priority investment programs and projects, funds for implementation, investment phases and plan implementation;
- To assess strategic environment for solid waste management plan (incorporating in plan report), including recommended measures for reducing negative impacts of environmental changes for solid waste management.
- To prepare maps for solid waste treatment in Ho Chi Minh City
6. Profile component:
Composition of product dossiers shall comply with the provisions of Circular No.12/2016/TT-BXD dated June 29th, 2016 on regulating dossier of tasks and blueprints of regional construction plan, urban plan and construction plan of functional areas and Circular 13/2007/TT-BXD dated December 31st, 2007 on guiding a number of articles of Decree No. 59/2007/NĐ-CP on solid waste management.
Text: Synthesis report, explanatory notes, relevant legal documents, draft report, decision approving the project "solid waste treatment plan of Ho Chi Minh City to 2025, vision to 2050”.
- Site map and regional links show study boundaries and scope of plan shown on appropriate scale map.
- Current solid waste treatment situation map show locations and sizes of transfer stations and concentrated solid waste treatment facilities, rate of 1/10.000 - 1/25.000.
CD saves entire contents of plan blueprints.
- Organizer: Ho Chi Minh City People's Committee.
- Appraisal agency: Ministry of Construction.
- Approval agency: Prime Minister.
- Planning time: 09 months from date of solid waste management plan task of Ho Chi Minh City to 2025 with a vision to 2050 approved.
Long Giang
Source: thuvienphapluat.vn
Program on conservation and development of Vietnamese craft villages in a period of 2021 - 2030
Implementation plan of marine aquaculture development project in Ninh Binh province to 2030 with a vision to 2045
Plan on implementing national environmental protection strategy to 2030 with a vision to 2050 in Kien Giang province
Plan on implementing Decision No. 327/QD-TTG dated March 10, 2022 of the Prime Minister approving the project on developing sustainable and effective wood processing industry in the period of 2021-2030 in Gia Lai province
Action plan on implementing strategy of sustainable agricultural and rural development in a period of 2022-2030 with a vision to 2050 in Hanoi city
Plan on implementing Decision No.923/QD-TTG dated August 2, 2022 of the Prime Minister approving science and technology program for new rural construction in a period of 2021-2025 in Vinh Long province
Plan on implementing strategy of sustainable agricultural and rural development in Bac Kan province in a period of 2021 - 2030 with a vision to 2050
Action plan on implementing livestock development strategy in a period of 2022-2030 with a vision to 2045 in Hanoi city
Implementation plan of Vietnam's forestry development strategy for a period of 2021-2030 with a vision to 2050 in Gia Lai province
National master plan in a period of 2021-2030, vision to 2050
Program on strengthening environmental protection, food safety and rural clean water supply in building new countryside in a period of 2021-2025
Digital transformation program on building new countryside, towards smart new countryside in a period of 2021 - 2025
Rural tourism development program on new rural construction in a period of 2021 - 2025
Project on development of trade, e-commerce systems and border trade in Binh Phuoc province in a period of 2021-2025, orientation to 2030
Plan on implementing Decision No. 327/QD-TTG dated March ...
Concretize viewpoints, objectives, tasks and solutions of the plan in accordance with practical conditions of the locality, associating ...Plan on implementing national environmental protection ...
Implementation plan of marine aquaculture development ...
Program on conservation and development of Vietnamese ...
Plan on improving quality of human resources to 2025 and ...
Efforts taken to turn culinary culture into national ...
The Vietnam Cuisine Culture Association (VCCA) is taking steps to implement a project to build and develop Vietnamese culinary culture ...Vietnamese cuisine making a name for itself with ...
Vietnam advance to next round of AFC U20 Women’s Asian Cup
Cultural tourism and traditional values promoted through ...